How we work together

Seven stages from call to keys.

Engagement is structured the Western way: clear deliverables at every stage, fixed payment tranches, no surprises. You always know what's next and what it costs. The first call is free.

01 · Free

30-minute introductory call

You walk me through the project — plot, family, timeline, budget reference. I share an initial professional take and a price reference. Either we go further, or we don't. No pressure.

02 · 30% paid

Brief, contract, first tranche

A detailed brief covering plot, family heights, lifestyle, style preferences. A written contract with scope, deliverables, schedule. First tranche (30%) initiates the work.

03 · 2–3 weeks

Site analysis & sazhen calibration

Plot orientation by true north, insolation by season, shadow analysis, wind. Sazhen scale calibrated to your family's heights. Vastu zoning of the future home.

04 · 40% paid

Concept master plan & mid-tranche

Master plan of the home with floor plans, sections, elevations, Vastu compatibility check on every room. Mid-call discussion. Once approved — second tranche (40%) releases.

05 · 2–3 weeks

Facade, materials, finalisation

Facade designed in Φ ratios. Material specification by local sourcing. Cost reference for budgeting. The full concept album takes its final form.

06 · 30% paid

Delivery of the concept album

A 30–60-page album with all drawings, tables and explanations. Final tranche (30%) on delivery. You now have what you need to commission working drawings — with us or with your local team.

07 · Optional

Working drawings & author supervision

If you continue with us into working drawings (6–9% of construction), the work begins immediately after concept delivery. Author supervision runs through construction — until handover.

About working drawings →

Principles I work by

Transparency on price

No «let's negotiate». Fees follow the global percentage-of-construction standard (RIBA / HOAI / SIA), with a fixed minimum. Full pricing →

Tranches tied to milestones

30% on signing, 40% on master-plan approval, 30% on album delivery. Each tranche is tied to a deliverable. You always know what you're paying for.

Mostly remote, occasionally on site

Calls + writing for most of the project. On-site visits for site analysis and key construction stages when needed.

If we don't fit, I say so

I take 6–8 projects a year. If our values don't align, I'll close the first call honestly. No false starts.

Start with a 30-minute call

Free, no obligation, on the substance.

Book a call